Suki Kinari Hydro Project

Country / Region
Pakistan
Project Profile
CGGC Suki Kinari hydropower project locates above Kunhar River,district manshera,KPK province of Pakistan,the elevation of which is between 1300m and 2400m.the dam site of SK project has a distance of 256km from islamabad. The total gross installed capacity of SK project is 873.508 MW with the supply of 4 sets of Impiles turbines. The total investment of SK project is 1.96 billion dollar with 6 years construction period. As an EPC project ,the Contract price of this project is 1.314 billion dollar. This project composes of Dam Spillway,intake,headrace tunnel,surge branch,Pressing piping,power house,tailrace tunnel and other main building.
Application of OVM Product / Service
Water Reserve and Hydropower;Hydropower Station Pier;Post-tensioned Prestressed Construction Equipment;Suoervision or Technical Service,OVM;OVM Geotechnical Anchor Cable,Anchor Bar
Learn more about our product systems
PT OVM Prestressing Technology Indonesia
Tel: +62-819-1036-5415
Website: www.ovm.co.id
E-mail: benittobino@ovm.cn
Address: Citra Tower Kemayoran, Lt. 3 Unit H1 Kavling A6, Jl. Benyamin Sueb, RT. 013 RW. 006, Kel. Kebon Kosong, Kec. Kemayoran, Kota Jakarta Pusat, DKI Jakarta - 10630