OVM's 500-ton hydraulic lifting system has successfully completed rigorous overload testing under simulated operational conditions. The equipment demonstrated exceptional performance by:
• Sustaining a 625-ton static load (125% of rated capacity) at mid-span
• Executing lifting, lowering and slide with 550-ton counterweights (110% of rated load)
The engineering team developed a customized asymmetric steel portal frame solution to address the project's spatial constraints and complex piping layout. The comprehensive package included:
- Structural optimization for load distribution and longevity
- Integrated installation/dismantling protocols
- Full operational life-cycle support
This achievement validates OVM's technical capabilities in delivering heavy-load solutions for space-restricted infrastructure projects while maintaining strict safety margins.
PT OVM Prestressing Technology Indonesia
Tel: +62-819-1036-5415
Website: www.ovm.co.id
E-mail: benittobino@ovm.cn
Address: Citra Tower Kemayoran, Lt. 3 Unit H1 Kavling A6, Jl. Benyamin Sueb, RT. 013 RW. 006, Kel. Kebon Kosong, Kec. Kemayoran, Kota Jakarta Pusat, DKI Jakarta - 10630